As you can see our brave construction workers are working hard battling the bad weather to achieve their first milestone, with precast walls now being installed and the apartments starting to resemble something you could feel at home in!

Our display suite is open from 12-2pm on weekdays and 12-3pm on weekends. Come down and check it out!

We are excited to announce that 48 Macquarie Street has been awarded by the Australian Institute of Architects! for Excellence in Commercial Architecture.

Designed by Guida Moseley Brown and built by Morris Construction Corporation, 48 Macquarie Street is the second stage of our mixed-use Governor Place precinct and includes a multi-level carpark and an exciting mix of retail outlets on the ground floor.

Morris Property Group would like to sincerely thank all who contributed in making this project such a success.

Mayfair has recently achieved another significant milestone with the dismantling and removal of the tower crane from site!

Exterior painting works are continuing with the external look of the building really starting to take shape.
Internal apartment finishes are currently being completed and works to the Level 5 resident outdoor space has now begun.

A limited number of apartments are still available. For further information, visit the display suite located at 40 Alinga Street or visit www.mayfairapartments.com.au.

We are excited to announce the launch of our latest project, Highgate Canberra!

Perfectly located in the heart of the city, a range of 1, 2 and 3 bedroom luxury apartments are now selling from $399,900.

The brand new display suite at 20 Allara Street in the city includes a full 2-bedroom display apartment, giving you the opportunity to see the quality and attention to detail you can expect in your new home or investment.

Located on the corner of City Walk and Allara Street, Canberra City, the display is open from 10am-3pm Saturday-Sunday and 10am-6pm on weekdays.

Visit www.highgatecanberra.com.au for more details!

With the removal of the jump form early this year and only two concrete pours remaining, completion of the structure at Mayfair is fast approaching!
Fit out of the apartments is now well underway with plasterboard, tiling and painting trades working their way up the building. Kitchen joinery installation has also commenced.
You will have noticed that the metal car park façade screens at the base of the building have now been fully installed, and window glazing and balustrade works are also well progressed.

Our Mayfair project in Canberra City continues to progress at a rapid rate, with the jump form currently sitting at Level 16. The last jump form pour is expected to occur in the New Year, at which time it will then be dismantled and removed from site.

The first delivery of glazing items were received in the last week of November and install has commenced on Level 5.

The external façade on the car park levels continues to evolve with the installation of decorative screens being completed on Alinga Street side of site. As part of the artist’s feature facade design, approximately 450 perforated panels will be installed!

Our latest Queensland project Essence Surfers Paradise has now launched!

Located in the heart of Surfers Paradise, Essence features a range of 2 & 3 bedroom apartments over 33 levels, starting from just $469,900.

Visit www.essencesurfersparadise.com.au or call 1800 016 836 for more details!

The structure for the first stage of Mayfair (the car park) was completed during the last month and has brought about the commencement in construction of the residential tower.

Services rough in has continued through the car park levels
and is now approximately 80% complete.

Works to the feature façade are anticipated to commence next month, with approximately 450 perforated panels to be installed.

The jump form is currently at Level 12 and is expected to reach Level 15 by the end of the year!

Our brand new display townhouse is now open!

Come down this weekend and see the attention to detail you can expect from your new home or investment at Macquarie Park!

Open from 12-3pm Saturday and Sunday, as well as 12-2pm weekdays. An agent from Colliers will be on hand to answer any questions you may have.

The site team at Mayfair have reached another milestone for the project with the establishment of the structure cycle for the Level 5 transfer slab.

It is estimated that at the completion of the transfer slab approximately 93 tonnes of reinforcement, 48 tonnes of post tensioning and 1,200 cubic metres of concrete will have been used to construct this floor!

The jump form has now reached the half way mark and will be constructed in conjunction with the residential floors below.